City Slash

During the cold spell, the boiler house really did borrow power from the tower to start its pump. By the time you reach the boiler house, the pump has been back on its own supply for three days. The recurring evening outages trace back to a night loading order, P-6. Spoilers for chapter three of Light on a Schedule.

Two arrows on the boiler-house cover

Look at the cover of T-4 on the east wall of the boiler house. The incoming cable number matches the one copied on the roof. Beside the arrow for pump N-2 is a newer arrow marked P-6. From the plate alone, you could reasonably think both lines still draw power from the tower.

Grigory remembers signing off on the emergency pump start. Ask him for access to the shift log and look for two different entries. One dates the pump’s return to its regular supply. The others record switches during the hours the tower went dark. P-6 is the number that keeps appearing.

Source: Open World: getting started

What the indicators show, and what Grigory signed

The external indicators show the two lines as they stand now. N-2 is on its regular feed. P-6 is still connected to T-4. The shift log adds the detail missing from the indicators: when each switch occurred. That timing rules out the pump as the reason the tower still loses power in the evenings.

Take the readings back to Grigory. He recognizes P-6 as a dispatch order for night loading and confirms he left the jumper in place on orders. His signature covers the work he performed on his shift. His copy cannot tell you who authorized priority for the loading operation or who received the shipment. Lada pays 110 coins for the findings, and the pump stays on.

Source: Open World: getting started

Sources

Interfaces and rules can change. Check the official pages above for current requirements.

More guides for this game

More about City Slash

Back to top