
To run two trains around a circuit, give them three separate blocks. The extra block lets one train move while the other waits for a clear section.
Count sections around the circuit
The station already counts. One possible arrangement adds a chain lift set to act as a block and a separate block brake run before the station. Several adjoining pieces of brake track can still form a single stopping section.
Source: Player question about two trains, Kosii demonstrates block brakes
Check the length with a test run
Allow room for the whole train on the brake run. If the second train remains unavailable, shorten the trains temporarily and check the available count again. During testing, watch the waiting train when the block ahead is occupied: it should proceed once that section clears.
Source: Player question about two trains, Kosii demonstrates block brakes
Sources
Interfaces and rules can change. Check the official pages above for current requirements.